During the night of 5th to 6th November 2019 the Rijksweg in Gulpen, Limburg, The Netherlands was closed for traffic and a pre mounted pipe bridge was hoisted on its pilons. This pipe bridge now connects the new sustainable brewhouse with the existing fermentation and filling facilities of the local family brewery